As promised, our new flooring. It wasn't an easy job and I was glad we hired Luis to help us. While Luis tore up the old floor, I carried it out to the dumpster. Needless to say - WHAT A WORKOUT. It took a couple of days to tear out and then a good week to finish the floor. Luis did move our half-bath, toilet, and sink placement too, so that entered into the time frame. But overall.....the floor is stunning and works so well with the color of the stairs, I did. Luis also laid the peel-and-stick tiles in our mudroom/laundry.
I will say this though - I am totally wiped out about doing any DIY for a while lol
The floor color before - and this was the after removing the old kitchen cabinets lol
Midway point.
We choose